Wall-to-wall Wi-Fi across a whole campus, built for the next decade.
St Thomas More College wanted fast, reliable, scalable wireless across every academic and residential building in Crawley. cimply designed, deployed and now runs the whole thing, on the latest Wi-Fi 7 standard.
An architect in the Melbourne Studio opens a model in Perth as if it were on the next desk.
Hunt Architects needed its Perth and Melbourne studios working on the same large-format Revit models at the same time, with no lag and nothing at risk. cimply built the shared infrastructure that makes 70TB feel local in both cities.
A 1930s residential college, wired for the next generation of learning.
St Georges College needed a full technology refresh across a heritage campus of separate buildings and wings. cimply ran new fibre to every building, refreshed the equipment to the latest standard and now keeps 2,000 devices online for study, streaming and gaming alike.
Three early learning centres, built from the ground up to feel like one.
Nurture Early Learning is opening holistic children's centres from the ground up, and wanted every site to feel the same from day one. cimply designed, built and now manages the technology across all three centres, from Wi-Fi to cameras to access control, on one standard that travels to every new build.
What we have been thinking about.
The most recent case studies and articles. Every piece is written to tell you something useful, not to fill a content calendar.
- Latest
- Oldest
- A–Z

If your IT provider only calls back once something is already broken, you are paying for the wrong thing.
For an accounting or law firm, IT is not a cost centre. It is billable hours, client trust and the difference between a smooth EOFY and a lost week. Here is what break-fix is quietly costing you.

If your stock lives in three systems and a spreadsheet, you are paying people to retype numbers.
Between your POS, your inventory platform and your accounting, how many times is the same figure keyed in by hand? Every one of those is a delay, an error and a job nobody should be doing.

How a Perth accounting firm made tax season their quietest IT period of the year.
For a 25-person accounting firm in Perth, July to October used to mean IT chaos. Slow systems, dropped connections and a support line that rang out when they needed it most.

An architect in the Melbourne Studio opens a model in Perth as if it were on the next desk.
Hunt Architects needed its Perth and Melbourne studios working on the same large-format Revit models at the same time, with no lag and nothing at risk. cimply built the shared infrastructure that makes 70TB feel local in both cities.

Wall-to-wall Wi-Fi across a whole campus, built for the next decade.
St Thomas More College wanted fast, reliable, scalable wireless across every academic and residential building in Crawley. cimply designed, deployed and now runs the whole thing, on the latest Wi-Fi 7 standard.

How a Perth accounting firm made tax season their quietest IT period of the year.
For a 25-person accounting firm in Perth, July to October used to mean IT chaos. Slow systems, dropped connections and a support line that rang out when they needed it most.
Want this kind of thinking applied to your business?
Most of what we write comes from real conversations with clients facing the same things. The conversation can start with you next.